Introduction
The strategy describes the high level test
schedules and the types of testing that are performed. The intended audience
for this document is Quality Assurance, Development and Project Management
teams and client.
Scope of
Testing:
List out the functionalities that we are covering
Smoke Testing
Entry Criteria:
- Unit Testing should be done with all Unit Test Cases should be Passed and ensure that it meets the initial requirements and prepare the way for further QA Team
- Build should be deployed in QA Environment without any errors
- QA Environment should be Up and running state
- All the defects which are raised in previous build should be in fixed state in defect management tool
- Smoke Test Cases should be in place
Exit Criteria:
- All the Smoke Test Cases should be Pass
- Test Results Captured
- Defects logged in defect management tool
Functional Testing
Entry Criteria:
1.
Smoke Test Cases should be PASS
Regression
Integration Testing
System Testing
User Acceptance Testing
Pre production
Performance Testing
Work Plan:
Schedules and Timeliness for
each phase of Testing
Phase
|
Start Date
|
End Date
|
Smoke Testing
|
||
Test Data Selection:
Below are the popular method for selecting the
test data and it is most important while doing the execution
1.
Random Testing – Generally this method is using for crash testing (robustness
testing) – Will the system survive this input?
Define all input parameters – E.g Integer,
real, string etc..
2.
Risk based Testing – Identify the Risk of not delivering a certain
functionality
3.
User profile Testing – In this type of testing generate test that mirror the user's
way of using system
4.
Bach's heuristic risk
based testing -
Based on Tester's experience generate a generic risk checklist (things that are
important to test), Risk Catalogue (things that often go wrong)
Defect Reporting and Data Recording:
·
Record testing defects into the tool identified for the project
(Portals)
·
Review of Defects & its Maintenance in repository
·
Frequent Defect Clarification/analysis is performed
·
Each and every defect is assigned to a Developer. If there are any
clarifications pertaining to these defects, it must be recorded in the Defect
management system.
·
Once the Development is satisfied that the defect has been fixed,
a note is made on the defect management system that the component(s) affected
by the defect are ready for re-testing.
·
Only when re-test has been successfully completed with no critical
failures the Testing will be signed-off.
·
It is expected that defect discovery rates will eventually
diminish as the testing and fixing progresses. This must be monitored closely
as the application system goes through the different phases of testing.
Suspension and Resumption
Criteria
S.No
|
Suspension Criteria
|
Resumption Criteria
|
Change Log:
Version No
|
Changes Made
|